Turner ECS has been awarded with the order to retrofit the control systems on board a pipelay/heavy lift/construction vessel sailing under the Portuguese flag. The existing Viking 35 controllers will be replaced by Woodward's free programmable LECM controllers on all 12 engines:
2 x 5760kW MAK 12VM32C
6 x 2880kW MAK 6M32C
4 x 2565kW Hyundai 9H25/33
If you have similar needs for your vessel you may also refer to the work we've done on the Volcan De Tirajana in 2019 and in any case don't hesitate to contact us for any additional information.